CHZ Lighting - LED Street Light Manufacturer and LED Flood Light Factory Since 2013
1. When installing the solar cell module, handle it with care, and it is strictly forbidden to short-circuit the solar cell module. 2. The connection between the power cord and the wiring, the solar street light pole and the threading place of the solar cell module are sealed with silicone, and the connection wire of the cell module needs to be firmly fixed at the bracket to prevent the power cord from sagging or pulling for a long time. even fall off. 3. When installing the solar street lamp head and light source, handle it with care to ensure that the light-transmitting cover is clean and free of scratches. 4. When moving the battery, do not touch the battery terminals and control valve, and it is strictly forbidden to short-circuit or roll the battery. 5. Pay attention to the positive and negative poles when wiring, and it is strictly forbidden to connect them in reverse. 6. Do not touch the +- poles of the solar cell module and the battery at the same time to prevent the danger of electric shock. 7. Avoid scratching the solar LED street light body during the installation process. 8. The bolts of the solar street lamp head, lamp arm, upper lamp pole assembly, solar cell assembly and other bolts are firmly connected without loosening. 9. A guard plate must be added when installing solar cell modules. 10. The galvanized hole of the solar LED street light pole should be sealed with the matching sealing device or silica gel, and pay attention to the appearance. For details, please log in: www.chz-lighting.com.
Quick Links
CHZ Lighting Products
Contact Us
WHATSAPP :+86 159 2122 3752
Wechat: +86 159 2122 3752
SKYPE: jolina.li
Address : No.518, Xiangjiang Road,Shanghai, China