CHZ Lighting - LED Street Light Manufacturer and LED Flood Light Factory Since 2013
Changhui solar street light manufacturers remind new and old customers to pay attention to the following points when installing solar LED street lights: 1. During the construction process, you must pay attention to the installation position and the depth and width of the foundation. Please choose the best one according to the height of the pole. When placing the embedded parts, you must pay attention to choosing a floor cage with reinforcing ribs. At the same time, you cannot use cheap materials to save money during construction, because that will reduce the bearing capacity of the foundation; 2, you must wait when installing the light pole The construction is carried out after the foundation is completely solidified. In the past, we met many customers in order to meet the deadline. The concrete is solidified for 24 hours and the solar LED street lights are eagerly installed. It is wrong because doing so will reduce the windproof level of the light pole, and some will tilt after installation, which greatly affects the overall windproof level of the light pole; 3, solar energy When hoisting LED street lights, you should choose a fixed place to tie the strap. You cannot choose the arm of the lamp pole or the solar frame for hoisting, because the connection of the lamp arm is generally fixed with screws, and we cannot ensure the material of each screw. All are so good; 4. Wiring is the most important point after the hoisting is completed. Because the internal wiring of solar LED street lights is not too much, but if you don’t understand, please contact the solar street light manufacturer in time to prevent the wrong wiring from causing solar energy A certain part of the LED street light is burnt or damaged.
Quick Links
CHZ Lighting Products
Contact Us
WHATSAPP :+86 159 2122 3752
Wechat: +86 159 2122 3752
SKYPE: jolina.li
Address : No.518, Xiangjiang Road,Shanghai, China