loading

 CHZ Lighting -  LED Street Light Manufacturer and LED Flood Light Factory Since 2013

Loss of circuit to create city light

1. The installation procedures and operations are very complicated. It requires laying cables, digging trenches to place cables, laying underground pipelines, threaded pipes, backfilling and other major infrastructure projects. The installation and commissioning site and online material requirements are more complicated, and labor and support costs are high.

2. Expensive long-term continuous lines and other repair or replacement modes, and annual maintenance costs.

3. There are safety risks, because of the quality of construction and renovation of landscape architecture, aging materials, electricity is abnormal, water pipes and electricity conflicts with other things have caused many safety risks.

4. Using circuits to create the city's light, the average life span is about 10,000 hours, and the longer the life span, the aging of the pipeline.

5. At the largest scale, the high cost and total investment of the city's lighting installation and use of circuits will exceed that of solar street lights. Another stolen cable cannot estimate the annual loss. The advantages of all solar street lights are obvious.

GET IN TOUCH WITH Us
recommended articles
Privacy Policy INFO CENTER 200FAQ
no data

Contact Us

Contact Person : Jolina
Tel : +86 2169898169
E-mail : Sales@chz-lighting.com

WHATSAPP :+86 159 2122 3752

Wechat: +86 159 2122 3752

SKYPE: jolina.li

Address : No.518, Xiangjiang Road,Shanghai, China

Better Touch Better Business

Contact Sales at CHZ Lighting.

Privacy policy

Copyright © 2025 Shanghai CHZ Lighting Co.,Ltd | Sitemap
Customer service
detect