CHZ Lighting - LED Street Light Manufacturer and LED Flood Light Factory Since 2013
Changhui solar street light installation site (connected to the solar battery line) construction method of solar street light Construction method 1. Fix the lamp position: According to the construction drawing and site conditions, determine the installation position of the street lamp with a distance of 30 meters between the lamp positions. 2. Dig the lamp foundation pit and battery room: Based on the drawings, dig the street lamp foundation pit and battery room at the basic position of the street lamp. 3. Battery room: brick walls, size, depth, and pre-embedded pipe fittings are shown in the drawings. 4. Pour the street lamp foundation, preset a firm ground ridge according to the street lamp foundation diagram, and use a level ruler to see the surface of the flat ground ridge to buy the piece. 5. Street lamp installation regulations: The high-speed (from the light source to the ground) elevation angle and installation direction of street lamps on the same street, highway and bridge should be consistent; the excavation size of the foundation pit meets the design requirements, the strength of the foundation concrete is not lower than C30, and the inside of the foundation is not lower than C30. The cable duct should be 30~50mm beyond the base plane from the center; the vertical center line of the lamp installation and the center line of the lamp arm should be consistent, the horizontal horizontal line of the lamp should be parallel to the ground, and there should be no skew after tightening; the lamp head is firm and reliable, and the lamp arm, lamp There should be no cable joints in the disk and lamp pole, and the threading hole should be smooth and free of burrs. It is best to use insulating sleeves to wrap, and the length of the wrapping should not be less than 200mm; the lamp arms, lamp poles, hoops, bolts and other metal parts used for street lamp installation must be Preservative treatment. 6. After installation, check that it is correct, carry out sub-item debugging, system debugging, and make records. 7. After debugging, the lamps and lanterns can be hoisted only after normal operation.
Quick Links
CHZ Lighting Products
Contact Us
WHATSAPP :+86 159 2122 3752
Wechat: +86 159 2122 3752
SKYPE: jolina.li
Address : No.518, Xiangjiang Road,Shanghai, China