CHZ Lighting - LED Street Light Manufacturer and LED Flood Light Factory Since 2013
The solar garden light installer (or engineering team) should arrive at the installation site with a small amount of system spare parts (such as screws, etc.), obtain a detailed installation project schedule, and discuss the project details (such as installation methods, load-bearing conditions, etc.). Before the solar garden light battery starts the installation project, the installation personnel (or engineering team) should be organized for training, and the precautions in the installation process and the battery usage and maintenance precautions should be introduced. Safety must be paid attention to during the installation process. The solar garden light installer (or engineering team) should carry out the unpacking inspection of the battery and the inventory of the accessories. The battery installation system diagram, installation and operation manual and other documents in the accessories box should be collected. According to the construction drawings of the solar garden light, check whether the battery is placed in a reasonable position in the computer room, whether the maintenance space is reserved, and whether there is a suitable distance from the heat source and the place where sparks may occur. Before starting to install the solar garden light battery, unpack the battery and take out the system diagram of the battery. It should be installed in strict accordance with the system diagram of the battery. The installation of any missing system components (including the paste of the battery cell number) is not allowed. All system components ( Spare parts) should be exactly the same as the model specifications specified in the installation drawing. Pay attention to the installation of the solar system. Because the battery is charged, pay attention to prevent short circuit, and all installation tools must be wrapped with insulating tape. Before installing the connecting strip, the battery for solar lighting should wipe off the dust on the battery pole, shell and steel frame with a clean linen cloth, especially to ensure that the dust on the pole is wiped clean. The unit number should be firmly attached. After the battery is installed, check whether all the screws are tightened one by one. It is necessary to designate a special person to check, and the special person is responsible to ensure that all screws are in a tightened state. After the solar lamp battery installation inspection is over, measure and record the open circuit voltage of all battery cells and the total voltage of the battery pack. After the solar garden light is installed and debugged, check the appearance of the battery, and at the same time check whether each connecting screw is tightened to ensure that the battery is shockproof, anti-skid and the connection between the batteries is reliable.
Quick Links
CHZ Lighting Products
Contact Us
WHATSAPP :+86 159 2122 3752
Wechat: +86 159 2122 3752
SKYPE: jolina.li
Address : No.518, Xiangjiang Road,Shanghai, China