loading

 CHZ Lighting -  LED Street Light Manufacturer and LED Flood Light Factory Since 2013

How to correctly construct LED solar street lights

Now, solar street lights not only illuminate the roads people walk on, but also save energy for the country's energy consumption. It is not only an environmentally friendly product, but also saves costs and contributes to the country. Therefore, solar street lights are widely used in the construction of new rural areas. The installation of solar street lights is very important, which determines the normal use in the later period. The correct installation is very important. We also need to understand the installation construction plan after the purchase of solar street lights. In order to prevent the later reinstallation or failure of normal use, the technicians of Changhui Lighting Technology Co., Ltd. will introduce us the construction plan of solar street lights.

The construction and installation process of solar street lights can be roughly divided into six steps: solar battery installation, controller installation, battery installation, lighting installation and related power distribution equipment installation. In order to ensure the installation quality of the above links, the following tasks should be done first.

1. Solar street lights should be carried out in accordance with standard design documents. If the design needs to be modified, the modification can only be made with the consent of the original design unit.

2. After winning the bid or signing the contract, the construction unit should carefully review the drawings, fully understand the design intent, and prepare the construction organization design (or plan) according to the characteristics of the project.

3. Formulate corresponding environmental protection measures and safety technical measures in compliance with national and local regulations and technical documents.

4. The equipment and materials required in the project should comply with the current relevant national standards. The inspection report should be complete, and the specifications, models and appearance quality should meet the design requirements.

5. The testing instruments and meters used in the construction must be qualified and within the validity period.

6. The construction unit should have the corresponding qualifications, and the construction personnel should be trained and qualified to work with certificates.

7. The quality control, data collection, and filing of solar street lights during the construction and construction process should refer to the current national standard 'Code for Construction Quality Acceptance of Building Electrical Installation Engineering' GB50303-2002: Data Collection, and should also refer to the implementation of 'Construction Engineering' Data Management Regulations' DBJ0151-2003.

GET IN TOUCH WITH Us
recommended articles
Privacy Policy INFO CENTER 200FAQ
no data

Contact Us

Contact Person : Jolina
Tel : +86 2169898169
E-mail : Sales@chz-lighting.com

WHATSAPP :+86 159 2122 3752

Wechat: +86 159 2122 3752

SKYPE: jolina.li

Address : No.518, Xiangjiang Road,Shanghai, China

Better Touch Better Business

Contact Sales at CHZ Lighting.

Privacy policy

Copyright © 2025 Shanghai CHZ Lighting Co.,Ltd | Sitemap
Customer service
detect