CHZ Lighting - LED Street Light Manufacturer and LED Flood Light Factory Since 2013
The technicians of Changhui solar street light manufacturer are here to introduce the installation instructions of solar street light controller to you as follows: 1. The order of the connection method should be accurate 1. Connect the LED light source 2. Connect the battery 3. Connect the solar panel 2. Solar street light controller Test method: 1. Set the time of the three working periods to zero hours 2. Press the reset (save) button 3. If the LED light source is on, it means the battery and LED light source are connected normally; 3. Working time setting method: 1 , Set the first working period: press the reset button for 1-2 seconds, the small indicator light flashes once per second, indicating that the controller has entered the first working period, and then adjust according to the time, set the first working period in detail Working time, 1h light on means 1 hour, 2h light on means 2 hours, 4h light on means 4 hours, 8h light on means 8 hours; by analogy: 1h+2h+4h+8hu003d15 hours, which means the first working time The working time set in the segment is 15 hours; 2, set the second working period: press the reset button for 1-2 seconds, the small indicator light flashes twice per second to indicate that the second working period is entered, adjust the setting method and The first working period is the same; 3. Set the third working period: press the reset button for 1-2 seconds, the small indicator light flashes 3 times per second to indicate that the third working period is entered. Adjust the setting method and the first and second The setting method of the two working hours is the same. 4. Press the reset (save) button to store the three working periods set, and the setting is over! Note: 1. When there is sun in the sky, the red and yellow light flashes on the small indicator light to indicate that the connection and charging status of the solar panel is normal. For example, the green light of the small indicator light at night indicates that the solar street light controller discharges the LED light source. The state is normal. 2. When setting the normal working period, the first working period cannot be set to the 0-hour working state, otherwise the solar street light controller cannot work normally!
Quick Links
CHZ Lighting Products
Contact Us
WHATSAPP :+86 159 2122 3752
Wechat: +86 159 2122 3752
SKYPE: jolina.li
Address : No.518, Xiangjiang Road,Shanghai, China